Protecnium is an international consulting firm that provides qualified technical personnel for the construction, engineering, and energy sectors in over 20 countries. Customized solutions for global projects.
Spain
United Kingdom
USA
Canada
Australia
Germany
Norway
Metropolitano de Lima. Lines 2 & 4The project consists of a 35-year concession for the design, financing, construction, operation and maintenance of line 2 and a branch of line 4 of the Lima Metro to Jorge Chávez International Airport.
Line 2 runs from Puerta de Callao station to Municipalidad de Ate station and includes 26.87 km of tunnel, 27 stations (two interchanges), three third tracks, a yard-workshop in Santa Anita, and 27 ventilation and emergency shafts. The line 4 branch runs from Gambetta Station to Carmen de la Legua Station and includes 7.66 km of tunnel, 8 stations (one interchange), a yard-workshop in Bocanegra and 8 ventilation and emergency shafts.
The excavation is carried out with two TBMs operated in EPB mode as well as an 8 km section in conventional mode.
Protecnium contributed to the work with a Draftsman, BIM specialist, tunnel shift engineers, supervisors and Tunnel and Auscultation assistants.