M11 Gorey-Enniscorthy
PPP Contract for Design, Construction, Operation and Maintenance of 40 km of new highway in Wexford County, Enniscorthy. The project runs 26 km of standard highway with two carriageways (M11 main line) of 120 km / h speed between Cloghand Scurlocksbush; 8 km (N30 Mainline, Enniscorthy Bypass) of standard single carriageway between existing N30 and existing N11 and 4 km (N80 Link Road) between existing N11 / N80 intersection, north of Enniscorthy, and M11. Also the realignment of approximately 11 km of side roads.
Protecnium contributed the topographic field work, both for earthworks and structures.
Auckland Northern Corridor
This tender provides better links for travelers on the Northern Expressway (SH1) in Auckland and improves transportation options in the North Shore for cars, pedestrians and cyclists. Includes a new highway connection between SH1 and SH18, which opens access to the Western Ring Route and the airport.
Protecnium contributed to this tender civil engineers specialists in structural calculation and cost estimation engineers.
1390 MW Waad Al Shamal Combined Cycle Power Plant
The project includes the construction of a 1,390 megawatt combined cycle power plant located in the mining town of Waad Al Shamal, Saudi Arabia. The plant also includes 50 megawatts of the concentrated solar plant that will integrate with the CCGT water-steam cycle. The project will be able to provide the equivalent energy needed to supply more than 500,000 Saudi homes.
Protecnium contributed the Direction of Topography, as well as office and field topography, civil field engineers for foundations and the direction of the quality department.
Escatron project Solar Pant
The project consists of a large energy installation that will be the largest of its kind to be commissioned in Europe with a combined power of 850 megawatts (MW) and a total of 3,173 hectares of surface among the 18 plants that make up the project.
The investment in the project is around 500 million euros, making it a unique initiative that will place the Aragonese community at the forefront of renewable energy worldwide. 850 MW will be developed, 54% of the 1,550 that was awarded in the third renewable energy auction of the Ministry of Energy. Escatrón will be the epicenter of this photovoltaic complex, hosting ten of the 18 plants in its term, while five will be in Chiprana and another three in Samper de Calanda.
Protecnium provides surface surveyors and surveying aids. As well as specialists in occupational risk prevention.
Oran Tram
The Oran Tramway is one of his most emblematic works in the Middle East. With the capacity to transport 90,000 passengers a day, it will allow up to 88 million people to use its facilities annually.
The Oran Tram, with a budget of 365 million euros, has a bidirectional line of 18.7 kilometers in length with 32 stations, 11 electrical substations, two viaducts and an underpass. At one end, in “Sidi Màarouf”, some 70,000 m2 garages were built with a workshop, a washing tunnel, a service station, a System Control Center (PCC) and an administrative building, at the other end, in “ Es Senia ”, an 11,750 m2 train parking lot was built outside with an administrative control building.
Protecnium provided surface surveyors and surveying aids as well as delineation specialists.
Homestead Extension of Florida’s Turnpike (HEFT)
Extension of SR 821 (HEFT) from Florida Turnpike to south of Miramar Parkway, in Miami-Dade and Broward counties. The HEFT main highway widens from four lanes to eight lanes, three 12-foot general-purpose lanes and a 12-foot express lane. Other project work includes milling and repaving, road widening, bridge widening, pavement marking, lighting, ITS, noise walls, and drainage improvements.
Protecnium provides specialized field surveying equipment, as well as surveying headquarters.
Remodeling of the Main Terminal at Denver airport
The "Great Hall" project carried out an improvement to the Jeppesen terminal of the Denver International Airport that covers an area of more than 70,000 square meters. Improvements include new commercial and restaurant areas, relocation and expansion of security zones, improvement of access to the building and passenger traffic flows, a new check-in area and optimization of space and efficiency of the terminal.
Protecnium contributed two field surveyors specialized in construction of structures.
Connector East End
The North Carolina Department of Transportation builds the East End connector in Durham County to provide a direct connection between the Durham Expressway (NC 147) and Miami Boulevard (US 70), two major east-west triangle roads. Improves access to I -85 and I-40. The estimated cost for such a project amounts to $ 142 million.
The work involves building a 1.25-mile highway from NC 147 to US 70 and converting approximately 2.75 miles from US 70, which will be part of the East End Connector, into a highway.
Protecnium provides surface surveyors and surveying aids.
Fort Lauderdale Project
Design and construction of Phase 3A-2 of the Interstate 95 (I-95) Express Lanes project that runs north from Commercial Boulevard at 15,537 km to SW 10th Street at 23,710 km in Broward County, at a distance total of approximately 8.2 miles.
Protecnium contributed the Directorate of Topography and field topography.